INTEGRA
  • Home
  • About us
  • Our team
  • BIM
  • References
  • Contact
  • English
    • Hrvatski
    • English
Select Page
Development of the main design of route and preliminary designs of structures of the Southern Bypass of Mostar, section Miljkovići – Rodoč – connection to M17

Development of the main design of route and preliminary designs of structures of the Southern Bypass of Mostar, section Miljkovići – Rodoč – connection to M17

by ivangadza | Apr 11, 2022 | Uncategorized

As the leading partner in the consortium with IGH Mostar d.o.o., Faculty of Civil Engineering Mostar and Geo-Marić d.o.o., Integra developed 7.7 km of the main design of the route and intersections, and preliminary designs of structures, the most important of which...
Intersection M 6.1 Spanish Square and Intersection M 6.1 and Kardinala Stepinca Street in Mostar

Intersection M 6.1 Spanish Square and Intersection M 6.1 and Kardinala Stepinca Street in Mostar

by ivangadza | Apr 11, 2022 | ENG-Design in transport infrastructure, ENG-featured, ENG-news, Uncategorized

Integra developed variant conceptual solutions, traffic analysis and the main design for selected optimal variants for the reconstruction of the intersection on the main road M6.1 at the locations Spanish Square and the junction with Kardinala Stepinca Street (near...

Recent Posts

  • Development of the main design of route and preliminary designs of structures of the Southern Bypass of Mostar, section Miljkovići – Rodoč – connection to M17
  • Development of the main design and related studies for construction of the Corridor Vc on the section: Zenica Municipality Northern Administrative Boundary (Nemila) – Donja Gračanica
  • Intersection M 6.1 Spanish Square and Intersection M 6.1 and Kardinala Stepinca Street in Mostar

Recent Comments

No comments to show.

INTEGRA d.o.o. Mostar

Dr. Ante Starčevića bb
88000 Mostar, Bosna i Hercegovina

Tel.: +387 36 397 531
Fax: +387 36 397 532

Email: info@integra.ba

  • Follow
  • Follow
  • Follow