Development of the main design and related studies for construction of the Corridor Vc on the section: Zenica Municipality Northern Administrative Boundary (Nemila) – Donja Gračanica

Development of the main design and related studies for construction of the Corridor Vc on the section: Zenica Municipality Northern Administrative Boundary (Nemila) – Donja Gračanica

As a designer and subcontractor, Integra developed the main design with all phases for a total of 15.37 km of full motorway profile for the contractor, the consortium Spea, Safege and Radis.The submitted project documentation at the level of the main design consisted...