Development of the main design of route and preliminary designs of structures of the Southern Bypass of Mostar, section Miljkovići – Rodoč – connection to M17
As the leading partner in the consortium with IGH Mostar d.o.o., Faculty of Civil Engineering Mostar and Geo-Marić d.o.o., Integra developed 7.7 km of the main design of the route and intersections, and preliminary designs of structures, the most important of which...
Development of the main design and related studies for construction of the Corridor Vc on the section: Zenica Municipality Northern Administrative Boundary (Nemila) – Donja Gračanica
As a designer and subcontractor, Integra developed the main design with all phases for a total of 15.37 km of full motorway profile for the contractor, the consortium Spea, Safege and Radis.The submitted project documentation at the level of the main design consisted...
Intersection M 6.1 Spanish Square and Intersection M 6.1 and Kardinala Stepinca Street in Mostar
Integra developed variant conceptual solutions, traffic analysis and the main design for selected optimal variants for the reconstruction of the intersection on the main road M6.1 at the locations Spanish Square and the junction with Kardinala Stepinca Street (near...
Design in transport infrastructure
Development of the main design of route and preliminary designs of structures of the Southern Bypass of Mostar, section Miljkovići – Rodoč – connection to M17
As the leading partner in the consortium with IGH Mostar d.o.o., Faculty of Civil Engineering Mostar and Geo-Marić d.o.o., Integra developed 7.7 km of the main design of the route and intersections, and preliminary designs of structures, the most important of which...
Development of the main design and related studies for construction of the Corridor Vc on the section: Zenica Municipality Northern Administrative Boundary (Nemila) – Donja Gračanica
As a designer and subcontractor, Integra developed the main design with all phases for a total of 15.37 km of full motorway profile for the contractor, the consortium Spea, Safege and Radis.The submitted project documentation at the level of the main design consisted...
Intersection M 6.1 Spanish Square and Intersection M 6.1 and Kardinala Stepinca Street in Mostar
Integra developed variant conceptual solutions, traffic analysis and the main design for selected optimal variants for the reconstruction of the intersection on the main road M6.1 at the locations Spanish Square and the junction with Kardinala Stepinca Street (near...
Field and research works
Development of the main design of route and preliminary designs of structures of the Southern Bypass of Mostar, section Miljkovići – Rodoč – connection to M17
As the leading partner in the consortium with IGH Mostar d.o.o., Faculty of Civil Engineering Mostar and Geo-Marić d.o.o., Integra developed 7.7 km of the main design of the route and intersections, and preliminary designs of structures, the most important of which...
Development of the main design and related studies for construction of the Corridor Vc on the section: Zenica Municipality Northern Administrative Boundary (Nemila) – Donja Gračanica
As a designer and subcontractor, Integra developed the main design with all phases for a total of 15.37 km of full motorway profile for the contractor, the consortium Spea, Safege and Radis.The submitted project documentation at the level of the main design consisted...
Intersection M 6.1 Spanish Square and Intersection M 6.1 and Kardinala Stepinca Street in Mostar
Integra developed variant conceptual solutions, traffic analysis and the main design for selected optimal variants for the reconstruction of the intersection on the main road M6.1 at the locations Spanish Square and the junction with Kardinala Stepinca Street (near...
Supervision and consulting
Development of the main design of route and preliminary designs of structures of the Southern Bypass of Mostar, section Miljkovići – Rodoč – connection to M17
As the leading partner in the consortium with IGH Mostar d.o.o., Faculty of Civil Engineering Mostar and Geo-Marić d.o.o., Integra developed 7.7 km of the main design of the route and intersections, and preliminary designs of structures, the most important of which...
Development of the main design and related studies for construction of the Corridor Vc on the section: Zenica Municipality Northern Administrative Boundary (Nemila) – Donja Gračanica
As a designer and subcontractor, Integra developed the main design with all phases for a total of 15.37 km of full motorway profile for the contractor, the consortium Spea, Safege and Radis.The submitted project documentation at the level of the main design consisted...
Intersection M 6.1 Spanish Square and Intersection M 6.1 and Kardinala Stepinca Street in Mostar
Integra developed variant conceptual solutions, traffic analysis and the main design for selected optimal variants for the reconstruction of the intersection on the main road M6.1 at the locations Spanish Square and the junction with Kardinala Stepinca Street (near...